Industry pain points
What typically goes wrong in this industry — and what it costs you.
1
Dust, heat and vibration
Office PCs and fans fail inside cabinets; one unplanned stop can cost a full production shift.
2
Legacy ports disappearing
New boards drop RS232/485 and GPIO, pushing fragile USB adapters into critical control loops.
3
24/7 duty cycle
Consumer hardware is rated for 8×5 use; continuous duty accelerates capacitor and SSD ageing.
4
Short platform lifecycle
Chipsets change every year, invalidating validation and forcing costly re-certification.
Recommended models
Platforms we ship for this scenario, with the I/O and thermal headroom it needs.
F25
Industrial Controller · 6 × COM + 4 × LAN
6 × COM + 4 × LAN for multi-axis control and MES gateways
View model ›
F24-8L SFP+
Network Appliance · 8 × 2.5 GbE + SFP+
8 × 2.5 GbE + SFP+ for machine-vision backhaul and network appliances
View model ›
AGV Terminal
AGV Control Module · EtherCAT / GMSL
EtherCAT / GMSL onboard control for AGV and AMR platforms
View model ›
K8-F24
IIoT Gateway · Pentium · 4 × COM
4 × COM IIoT gateway for shop-floor data acquisition
View model ›
Application cases

Automotive parts plant · 320 units
F25 controllers replaced desktop PCs on 14 welding lines. Cabinet temperature reaches 62 °C — zero fan-related stops in 18 months.

AGV fleet integrator · 60 units
AGV Terminal runs navigation and GMSL camera capture on a single board, cutting onboard hardware cost by 27 %.
Need a configuration for your project?
Tell us the environment, the I/O list and the volume — a project engineer replies within one business day.
Request a Quote →





